BORNEO MINING CONTRACTOR
EST. 2010 -- SAMARINDA, KALTIM
01 / EXPLORATION
Heavy equipment rental, contract drilling, and earthmoving services for coal mining operations in East Kalimantan. Operating since 2010 with a fleet of 48 units across 7 active sites.
2010
YEAR ESTABLISHED
48
HEAVY UNITS
7
ACTIVE SITES
2.4M
BCM/YEAR CAPACITY
ISO
9001:2015
02 / SERVICES
From exploration drilling to overburden removal and coal hauling, our integrated service stack covers the full mining value chain.
Heavy Equipment Rental
SERVICE LAYER 01
Cat 336F, Komatsu PC300, and Volvo EC380 excavators for mining and earthmoving. Includes operator, fuel, and scheduled maintenance. Dry and wet hire options available for contracts from 3 months up to multi-year.
Drilling & Blasting
SERVICE LAYER 02
DTH and rotary drilling for overburden and coal seams. Production blasting with licensed Blasters. Fragmentation analysis and vibration monitoring for compliance with mining regulations and community safety standards.
Overburden & Coal Hauling
SERVICE LAYER 03
24/7 articulated dump truck and rigid dump truck operations. Direct haul from pit to disposal or crushing station. Fleet management with GPS tracking and production reporting per shift, daily, and monthly.
Site Preparation & Reinstatement
SERVICE LAYER 04
Dozer and motor grader operations for pit floor grading, access road construction and maintenance, sediment pond construction, and mine site rehabilitation upon closure. Environmental compliance integrated into every operation.
03 / FLEET
Current active fleet as of Q2 2025. All units certified and maintained under ISO 9001:2015 procedures.
| UNIT TYPE | MAKE / MODEL | QTY | CAPACITY | APPLICATION |
|---|---|---|---|---|
| EXC | CAT 336F Hydraulic | 12 | 1.54 m3 | Coal loading, overburden |
| EXC | Komatsu PC300-8 | 8 | 1.4 m3 | Pit excavation, coal face |
| ADT | Volvo A40G | 14 | 40 tonne | Overburden hauling |
| RDT | CAT 773G Rigid | 6 | 64 tonne | Coal transport to ROM |
| DTZ | Komatsu D275A | 5 | 462 HP | Overburden dozing |
| GRD | CAT 16M3 | 3 | 250 HP | Road maintenance, grading |
NOTE: Fleet expanded by 8 units in 2024 following long-term contract award. Next expansion planned Q3 2025.
04 / PROJECT LOG
SITE-2019-A
ACTIVESENGATA AREA -- KUTIM REGENCY
SITE-2021-B
ACTIVEBIANGAN AREA -- BERAU REGENCY
SITE-2018-C
COMPLETEDBENUAPPA AREA -- BALIKPAPAN
05 / COMPANY
Established in Samarinda in 2010, Borneo Mining Contractor has grown from a small local operator to one of East Kalimantan's most trusted mining service providers. Our integrated approach means clients deal with one contractor across the full mining value chain.
All operations are guided by our integrated Quality, Occupational Health and Safety, and Environmental Management System certified to ISO 9001:2015, ISO 45001:2018, and ISO 14001:2015 standards.
ISO 9001:2015
Quality Management System. All procedures documented, audited, and continuously improved.
ISO 45001:2018
Occupational Health and Safety. Zero fatality target. LTIR below industry average.
ISO 14001:2015
Environmental Management. Land rehabilitation, water management, and emissions monitoring.
VISUAL FIELD EVIDENCE
Foto referensi Unsplash untuk konteks kontraktor tambang: open pit, excavator, haul road, heavy equipment, survey, HSE crew, dan material extraction.
06 / CONTACT
Provide your project details and production requirements. Our team will respond with a tailored proposal within 2 business days.
HEAD OFFICE
Jl. PT. Senaken No. 88
Samarinda, Kalimantan Timur
75111 Indonesia
proposal@borneomc.co.id
ops@borneomc.co.id
PHONE / WA
+62 812 9000 7890
+62 541 234 567
Response within 2 business days. No commitment required for initial proposal.